Loadout, transportation and lifting feasibility studies.
Heavy transportation route surveys.
Heavy lifting studies and design.
Lifting beams, spreaders and attachments design.
Barge ballasting, stability and mooring calculations.
Successful unloading of a barge carrying a 408t autoclave onto a purpose built jetty by floating roll off method at the Rio Tuba nickel mine in Philippines .
With a tidal difference of 1.5m per hour loadouts in Kuching, East Malaysia, are always much more challenging and require more detailed advance planning
.
Heavy Lifting & Transportation Consultancy and Engineering
A very succesful engineered lift of the 800t Maari Wellhead platform jacket section 6, wellbay using a 3 crane setup to a height of 35m above ground.
Jacking and transportation of the 800t Sumandak SUJT-A jacket in vertical position had to be carefully engineered and executed.