Engineered Transport

 

So far over 250 loadouts executed successfully.
 Engineering Capabilities
Lifting analysis and rigging design
Trailer strength and stability analysis
Barge stability strength and mooring analysis
Barge ballasting calculations
Structural design of attachments and supports
Loadout procedure
 
 On Site Package
Management, supervision and manpower supply
Equipment supply and operation
Self propelled trailers
Skid shoe based skidding equipment
Gripperjack systems
Barge monitoring system
Barge ballast pumps
Trailer roro ramps
Loadout transportation beam
Strandjacks
Mooring and pulling winches
Push out jacks
Manpower
Lifting loadout
Trailer loadout
Skidding loadout

 

 

Loadout of the 10,100 tonnes Maari Wellhead Platform onto the Dockwise Blue Marlin was done using 22 skid shoes with a capacity of 600t each.

 

 

 

 

 

Loadout of 3818MT Petronas Tangga Barat (TBCP-A) jacket at Pasir Gudang using 2 units of 588t Strand Jack

 

 

 

 

 

 

Loadout of 14000t BOA Topside using Strand Jack system

 

 

 

 

 

  Barge Ballasting for CPOC